Veza poslana na email.

Nismo vam mogli poslati linka na vaš email. Molimo provjerite svoju email adresu

Online Pomoć

GEO5

Tree
Settings
Proizvod:
Programa:
Jezik:

Verification According to the Safety Factor

The verification analysis according to factor of safety is selected in the "Pile CPT" tab. This frame also allows to define the required factor of safety for bearing capacity. Pile verification then assumes the form:

where:

Fs,d

-

pile load

SFb

-

safety factor for bearing capacity

Fr,d

-

pile bearing capacity